Amresh and Bhagwan together can do a piece of work in 20 days, Bhagwan and Chandar in 15 days, and Chandar and Amresh in 30 days. In how many days can Amresh, Bhagwan, and Chandar working together complete the work?
Amresh and Bhagwan together can do a piece of work in 20 days, Bhagwan and Chandar in 15 days, and Chandar and Amresh in 30 days. In how many days can Amresh, Bhagwan, and Chandar working together complete the work?
अमरेश और भगवान मिलकर एक काम 20 दिनों में कर सकते हैं, भगवान और चंदर 15 दिनों में और चंदर और अमरेश 30 दिनों में। अमरेश, भगवान और चंदर मिलकर काम कितने दिनों में पूरा कर सकते हैं?
Detailed Solution & Logic
$13\frac{1}{3} $ days / दिन
Amresh and Bhagwan / अमरेश और भगवान = A + B = $\frac{1}{20}$
Bhagwan and Chandar / भगवान और चंदर = B + C =$\frac{1}{15}$
Chandar and Amresh / चंदर और अमरेश = C + A = $\frac{1}{30}$
Lcm = 60
=$ \frac{3}{60} + \frac{4}{60} + \frac{2}{60} = \frac{9}{60} $
2(A+B+C) के बराबर हैः
= 2(A+B+C) = $ \frac{9}{60}$
= A+ B + C =$ \frac{9}{120} = \frac{3}{40}$
= Total time =1/ (A + B + C)
Answer= $\frac{40}{3} = 13\frac {1}{3} $ days
Similar Practice Questions
The average of 6.5, 10.7, 20.2
The average of 6.5, 10.7, 20.2 and a is 15. The value of a is:...
A gun is fired at a distance of 1.35 km
A gun is fired at a distance of 1.35 km from Mukul. She hears the...
Given is a circle with centre at C. A, B and D are the points on the circumference. Find ∠ABC.
Given is a circle with centre at C. A, B and D are the points...
Study the given bar graph and answer the question below.
Study the given bar graph and answer the question below. Number of Student Mark Obtained...
Solve / हल: $\sqrt{(7\times 447 \div 21 + 73 – 26 )}$
Solve / हल: $\sqrt{(7\times 447 \div 21 + 73 – 26 )}$
Let O be the centre of the circle and AB and CD are two parallel chords of equal side of radius 1.
Let O be the centre of the circle and AB and CD are two parallel...
The monthly incomes of two friends Ashish and Kiran,
The monthly incomes of two friends Ashish and Kiran, are in the ratio 5 :...